San Lorenzo

Number of turbines 27   Av. households supplied 141,912 households
Rating of turbines 2 MW Carbon dioxide saved:    
Wind farm size 54 MW        CO2 displacement tba tonnes p.a.
Predicted output 141,912 MWhr p.a.            
Note: The capacity factor used in these calculations is 30.00%.

Trans-Asia Renewable Energy Corp (TAREC) commissioned the Manila based team to project manage the construction. The installation marks a major milestone for the Philippine wind industry as it is the first WTG to be erected in the Visayas region of the Philippines.

Wind Prospect Asia Pacific is currently working on over 170MW of wind farms in the Philippines, this includes the 81MW, 27 turbine Carparispisan wind farm, and the 36MW, 18 turbine Nabas wind farm, as well as the 54MW San Lorenzo site.

Photo Gallery

There is 1 photo for this project. Click here to view.

Project Manager

Jamie Cornish
San Lorenzo, Philippines
San Lorenzo, Philippines
Bristol Website Design