Tir Mostyn & Foel Goch


List


 


 

Number of turbines 25   Av. households supplied 11,517 households
Rating of turbines 0.85 MW Carbon dioxide saved:    
Wind farm size 21.20 MW        CO2 displacement 30,549 tonnes p.a.
Predicted output 50,328 MWhr p.a.            
Note: The capacity factor used in these calculations is 27.10%.

Tir Mostyn and Foel Goch Wind Farm is located 8kms south west of Denbigh, North Wales and comprises of 25 Gamesa G52 turbines with an output of 21.3MW.

The site was energised in the autumn 2005 and was handed over the Client Hg Capital in late October 2005.

Wind Prospect currently act as owners engineer with the site managed and operated by Gamesa Eolica, based in Newport, South Wales.