The proposal consists of up to 15 wind turbine generators
in the general farming zone inland from the coastal track
at Troubridge Point, together with an underground electrical
cable network, access tracks, crane hardstandings, a wind
monitoring mast, a small switchgear building and yard, and
appropriate site signs.
Wind Prospect held a public exhibition for the proposed Troubridge
Point Wind Farm at the Edithburgh Institute, Edithburgh on
Monday, March 25th, 2002. About 150 people attended the exhibition
and of the 110 people who completed surveys, 98% either approved
of, or were not opposed to, the proposed Troubridge Point
Wind Farm. This public opinion survey was undertaken to assess
community support for the wind farm proposal.
Provisional planning approval for the 25MW wind farm and
the grid connection have been given by the District Council
of Yorke Peninsula, after receiving expert advice recommending
approval of the project from independent planning consultants
Access Planning.
|